Midwest Bank Arnold

This project was an approximate 5,000 square foot renovation. The exterior work included abating the roofing materials and replacing the shingles. Exterior cleaning and painting. The interior work was all new finishes. The finishes included new porcelain tile, carpet, wallcoverings and paint. The check writing station was replaced along with the teller line with new casework. The tops were all Cambria Stone.   We created a new “community room” to be used by local groups for meetings. All the work was phased and the branch remained open the entire time during construction. Even though the project was phased, we still were able to complete it just over three months and on budget.