Fresenius Kidney Care, Potosi, MO

This project consisted of an existing 6100 square foot building.  The building had to be totally gutted of existing restrooms and offices.  Once demolition was completed, the floor had to be saw cut to allow for all the new waste lines that had to go in for the equipment and new restrooms.  The finishes include sheet vinyl flooring, paint and wallpaper along with some ceramic tile.  The new casework and water chases were all plastic laminate with solid surface tops and backsplashes.  The project took just over three months to complete.