Ram’s Training Center

This pre-engineered building had over a two hundred foot clear span barrel vault roof. To accomplish this task, three cranes had to be utilized simultaneously to erect the roof framing. Special design considerations were given to accommodate the segmentation of the roof structure to assure there was no compromise to the smooth radius required for the standing seam roof system.